资源类型

期刊论文 8

年份

2023 1

2020 2

2016 1

2015 2

2009 1

2007 1

关键词

产业体系成熟度 1

产业安全可控 1

协助解密义务 1

可控、可追溯 1

可控性;分数阶阻尼系统;时变时滞;Gramian矩阵 1

布尔控制网络;矩阵半张量积;能控性;时滞 1

必要性原则 1

战略性新兴产业 1

救济措施 1

比例原则 1

网络进度计划;随机仿真;风险应对;工期可控性;评价 1

评价方法 1

展开 ︾

检索范围:

排序: 展示方式:

Analysis and experiment of controllability of magnetorheological fluids based on micro-pipeline

Yongqing SU, Yikuan SONG, Jiguang YUE

《机械工程前沿(英文)》 2009年 第4卷 第3期   页码 339-344 doi: 10.1007/s11465-009-0048-3

摘要: The controllability of the magneto-rheological fluid (MRF) flowing through a micro-pipeline is analyzed. The coupled formulas for MRF are deduced by analyzing the property of the flow field and magnetic field. Then, the relationship between the flow speed of MRF and the special shear stress under the effect of the magnetic field is founded. The model of the MRF and micro-pipeline is established by using multi-physics software of Comsol, the curve of - in an ideal condition is attained by modifying parameters, and by adding the boundary condition of the model. This paper provides a theoretical proof of the controllability of MRF flowing through the micro-pipeline and explores MRF’s application on the micro-drive and control field.

关键词: Magneto-rheological fluids (MRF)     micro-pipeline     coupled model     multi-physics simulation    

Controllability analysis of second-ordermulti-agent systemswith directed andweighted interconnection

Di GUO,Rong-hao ZHENG,Zhi-yun LIN,Gang-feng YAN

《信息与电子工程前沿(英文)》 2015年 第16卷 第10期   页码 838-847 doi: 10.1631/FITEE.1500069

摘要: This article investigates the controllability problem of multi-agent systems. Each agent is assumed to be governed by a second-order consensus control law corresponding to a directed and weighted graph. Two types of topology are considered. The first is concerned with directed trees, which represent the class of topology with minimum information exchange among all controllable topologies. A very simple necessary and sufficient condition regarding the weighting scheme is obtained for the controllability of double integrator multi-agent systems in this scenario. The second is concerned with a more general graph that can be reduced to a directed tree by contracting a cluster of nodes to a component. A similar necessary and sufficient condition is derived. Finally, several illustrative examples are provided to demonstrate the theoretical analysis results.

关键词: Multi-agent systems     Controllability     Directed tree    

状态和控制均具有多时滞的布尔控制网络可控性 Research Article

李一峰1,王兰2

《信息与电子工程前沿(英文)》 2023年 第24卷 第6期   页码 906-915 doi: 10.1631/FITEE.2200618

摘要: 本文研究状态和控制均具有多时滞的布尔控制网络可控性问题。首先,考虑控制具有多时滞的布尔控制网络可控性问题。对于该问题,本文通过定义一个新的矩阵乘积构建系统的可控性矩阵,基于该矩阵,得到一个系统可控的充分必要条件。其次,研究状态具有多时滞的布尔控制网络可控性问题,提出一个状态具有多时滞的布尔控制网络可控的充分必要条件。然后,提出一个状态和控制均具有多时滞的布尔控制网络可控性矩阵,利用该矩阵,提供一个简洁的可控性条件。最后,给出2个例子说明得到的理论结果。

关键词: 布尔控制网络;矩阵半张量积;能控性;时滞    

Life cycle and performance based seismic design of major bridges in China

FAN Lichu

《结构与土木工程前沿(英文)》 2007年 第1卷 第3期   页码 261-266 doi: 10.1007/s11709-007-0033-z

摘要: The idea of life cycle and performance based seismic design of major bridges is introduced. Based on the key components and non-key components of a bridge and the consideration of the inspectability, replaceability, reparability, controllability and retrofitability of the bridge components, different seismic design levels and expected performance objectives are suggested for the major bridges in China. The vulnerability analysis and progressive collapse analysis, as well as risk assessment, are also proposed to be the important issues to study in order to guide the seismic design of major bridges in the future.

关键词: controllability     progressive     reparability     different     important    

基于工期可控性的网络进度计划仿真评价方法研究

潘菲菲,王仁超,曹永雷

《中国工程科学》 2015年 第17卷 第1期   页码 143-150

摘要:

针对工程建设过程中常常通过资源重新配置或提高资源利用率来应对风险事件可能引起工期延迟的问题,提出了基于工期可控性的网络进度计划随机仿真评价方法,以资源配置和利用裕度作为活动的可控性衡量指标,同时考虑了风险事件发生时间不同导致的风险应对措施的可实施性不同的问题,通过对各个风险事件发生时间及其引起的活动持续时间延误、风险应对效果等进行随机仿真,从而对整个项目的工期分布进行模拟,评价编制的网络进度计划的合理性。算例表明:相对于传统的基于工期和基于因素的Monte-Carlo仿真评价方法,基于工期可控性的仿真评价方法得到的结果更为合理。

关键词: 网络进度计划;随机仿真;风险应对;工期可控性;评价    

产业体系成熟度评价方法研究

王礼恒,周志成,王崑声,陆春华,王海南,崔剑,马雪梅

《中国工程科学》 2020年 第22卷 第2期   页码 91-97 doi: 10.15302/J-SSCAE-2020.02.013

摘要:

本文提出产业体系成熟度概念,新增包括自主可控能力和行业主导能力在内的产业安全可控程度评价因素,构建相应的评价准则和评价模型。这一方法考虑了技术、设备、资金、产品等产业要素供给是否具有独立自主性,评价结果可以反映一国产业安全可控程度的基本状况。应对我国战略性新兴产业宏观研究亟需,完成了25个新兴产业方向的产业体系成熟度评价分析。结果表明,对于研究涉及的25个新兴产业方向,产业体系进入发展阶段或成熟阶段的产业方向数量相对较少,且多数产业方向的安全可控程度评价结果不佳。具体而言,仅有纯电动汽车产业的产业体系处于成熟阶段且产业安全可控程度强;轻薄化增强现实(AR)显示模组,生物医药、生物反应器及成套装置,应急疫苗研发与制备技术3个产业方向的产业体系成熟程度偏低,自主可控能力与行业主导能力均较弱。我国不少新兴产业方向在产业安全可控方面的短板较为突出,在加快构建自主可控的现代产业体系过程中,应注重提高本国资本对核心技术、原材料、标准、品牌等要素的掌控能力。

关键词: 产业体系成熟度     战略性新兴产业     评价方法     产业安全可控    

带有时变时滞的分数阶阻尼系统可控性研究 Research Articles

何彬彬1,周华成2,寇春海3

《信息与电子工程前沿(英文)》 2020年 第21卷 第6期   页码 809-962 doi: 10.1631/FITEE.1900736

摘要: 本文研究线性与非线性分数阶阻尼系统的可控性。该系统具有多重时变时滞,且时滞位于控制函数中。对于线性系统,基于Mittag-Leffler函数,定义一个可控性Gramian矩阵,该矩阵对于判定线性系统是否可控具有重要作用。此外,对于两种特殊线性系统,给出易于判别的若干等价可控性条件。对于非线性系统,在相应线性系统可控前提下,给出充分条件确保系统可控性。最后,给出两个数值示例验证结论有效性。

关键词: 可控性;分数阶阻尼系统;时变时滞;Gramian矩阵    

《网络安全法(草案二次审议稿)》第27条修改建议——以网络服务提供者协助解密义务为中心

崔聪聪,李欲晓,韩松

《中国工程科学》 2016年 第18卷 第6期   页码 34-38 doi: 10.15302/J-SSCAE-2016.06.007

摘要:

网络服务提供者协助解密义务,隐含着公权力(侦查权)与私权利(通信秘密权、隐私权)之间的冲突。用户的非公开信息应该在可控、可追溯基础上,遵循必要性原则和比例原则,综合考虑执法成本,司法机关经由法律确定网络服务提供者履行协助解密义务获取,进而达到社会治理管控、公众安宁生活与网络服务提供者营业自由的综合效益最大化目标,避免落入公权力严重侵犯私权利的情形或者出现政府失效的无序状态。

关键词: 协助解密义务     必要性原则     比例原则     可控、可追溯     救济措施    

标题 作者 时间 类型 操作

Analysis and experiment of controllability of magnetorheological fluids based on micro-pipeline

Yongqing SU, Yikuan SONG, Jiguang YUE

期刊论文

Controllability analysis of second-ordermulti-agent systemswith directed andweighted interconnection

Di GUO,Rong-hao ZHENG,Zhi-yun LIN,Gang-feng YAN

期刊论文

状态和控制均具有多时滞的布尔控制网络可控性

李一峰1,王兰2

期刊论文

Life cycle and performance based seismic design of major bridges in China

FAN Lichu

期刊论文

基于工期可控性的网络进度计划仿真评价方法研究

潘菲菲,王仁超,曹永雷

期刊论文

产业体系成熟度评价方法研究

王礼恒,周志成,王崑声,陆春华,王海南,崔剑,马雪梅

期刊论文

带有时变时滞的分数阶阻尼系统可控性研究

何彬彬1,周华成2,寇春海3

期刊论文

《网络安全法(草案二次审议稿)》第27条修改建议——以网络服务提供者协助解密义务为中心

崔聪聪,李欲晓,韩松

期刊论文